Product Overview
Specification Table
| Specification | |
|---|---|
| Brand | Vestil |
| Type | Dock Barricades (DJG) |
| Available Models | 3 |
| Price Range | $3,598.30 – $5,881.17 |
| Origin | Made in USA (Vestil Manufacturing) |
| Warranty | 1-Year Limited |
| Model # | Description | Price |
|---|---|---|
| DJG-100MW | DOCK BARRICADE MANUAL HAND CRANK 8 FT | $3,598.30 |
| DJG-100 | DOCK BARRICADE ELECTRIC/HYDRAULIC 8 FT | $5,486.03 |
| DJG-100-10 | DOCK BARRICADE ELECTRIC/HYDRAULIC 10 FT | $5,881.17 |
FAQ about this model
What sizes are available, and which model fits my dock door?
Two widths are offered: 8 ft and 10 ft. Three models exist — DJG-100MW (manual hand crank, 8 ft), DJG-100 (electric/hydraulic, 8 ft), and DJG-100-10 (electric/hydraulic, 10 ft). Measure the clear width of the dock opening you need to block and choose the barricade that spans it. The 10 ft width is only offered in the electric/hydraulic version.
What is the difference between the manual and the electric/hydraulic models?
The DJG-100MW is raised and lowered with a hand crank, while the DJG-100 and DJG-100-10 use an electric/hydraulic system. The hand crank unit needs no power connection at the dock position and is the lowest priced at $3,598.30. The specifications do not list voltage or amperage for the electric/hydraulic models, so confirm power requirements before installation.
How much do these dock barricades cost?
Prices run from $3,598.30 to $5,881.17 depending on model. The DJG-100MW manual 8 ft unit is $3,598.30, the DJG-100 electric/hydraulic 8 ft unit is $5,486.03, and the DJG-100-10 electric/hydraulic 10 ft unit is $5,881.17. The product data does not include freight cost or lead time, so request those separately.
What warranty comes with them and where are they made?
They carry a 1-Year Limited warranty and are made in the USA by Vestil Manufacturing. The specifications do not detail what that warranty covers, whether labor or return freight is included, or how a claim is handled. Ask for the full written warranty document before ordering if those terms affect your decision.
Does a dock barricade satisfy fall protection requirements at an open dock door?
The specifications do not state any certification or compliance rating. Fall protection at open loading dock edges in US workplaces is regulated by the Occupational Safety and Health Administration (OSHA), and the employer decides what the current standard requires for a given dock position. A barricade physically blocks an unoccupied opening; it does not replace vehicle restraints, wheel chocks, or written dock procedures.
Shipping & Returns
We offer standard 1-5 business day shipping (following dispatch) via LTL Freight, FedEx, UPS, DHL, or USPS. Orders typically process in 1-2 business days (starting the following business day). Shipping rates are usually calculated at checkout; however, we reserve the right to provide custom shipping quotes for oversized or specialized equipment.
60-DAY NO-HASSLE REFUNDS AND RETURNS
If there’s an issue with your product, we make refunds and returns quick and easy.
To be eligible for a return, your item must be in the same condition that you received it, unworn or unused or unused, with tags, and in its original packaging. To contact us, email info@vovlift.com
More information on shipping and returns can be found here.